1 presentations shared for the search Generator Synchronization:


Analysis of transient recovery voltage on circuit-breaker connected to HV terminals of step-up transformer located in hydro power plant

Author(s): Bozidar Filipovic,Nina Stipetic, Franjo Vukovic
Type:PDF Presentation
Downloaded: 5
Date: 2022-09-01

Rating:
* 0 vote(s)

Analysis of transient recovery voltage on circuit-breaker connected to HV terminals of step-up transformer located in hydro power plant


Abstract
This presentation deals with TRV on circuit-breaker installed in GIS at HV terminals of step-up transformer located in hydro power plant. An overview of standards covering TRV will be given. Modelling... see more

Tag(s): Transient Recovery Voltage (TRV), Step-Up Transformer, Generator Synchronization, Out-of-Phase Switching, Short-Circuit