Short-Term Scheduling of Active Distribution Systems

EMTP Software Icon

version 1.0.1 (22.8 KB) by n.sene


The latest distribution management systems tend to incorporate optimization functions for the short-term scheduling of the various energy and control resources available in the network (e.g., embedded generators, reactive power compensators and transformers equipped with on-load tap changers). The short-term scheduling procedure adopted in the paper is composed by two stages: a day-ahead scheduler for the optimization of distributed resources production during the following day, an intra-day scheduler that every 15 minutes adjusts the scheduling in order to take into account the operation requirements and constraints of the distribution network. The intra-day scheduler solves a non-linear multi-objective optimization problem by iteratively applying a mixed-integer linear programming (MILP) algorithm. The linearization of the optimization function and the constraints is achieved by the use of sensitivity coefficients obtained from the results of a three phase power flow calculation. The paper shows the application of the proposed approach to a medium-voltage 120 buses network with 10 dispatchable generators and 2 transformers equipped with on-load tap changers.

Authors: A. Borghetti, M. Bosetti, S. Grillo, M. Paolone, F. Silvestro

IEEE Bucharest Power Tech Conference, June 28th - July 2nd, Bucharest, Romania

Rating:

* 2 vote(s)

Date: 2015-04-02

Do you like the contribution? Rate it!
X