WAPA COTP (California Oregon Transmission Project) Series Capacitor Bank Replacement

Throughout this case study, you will learn about the California Oregon Transmission Project (COTP) and its goal of replacing the existing fixed series capacitor banks (FSCBs) with new equipment. - Leopoldo G. Gallegos Jr.

To download the presentation you must login .

Throughout this case study, you will learn about the California Oregon Transmission Project (COTP) and its goal of replacing the existing fixed series capacitor banks (FSCBs) with new equipment.


Do you like the Presentation? Rate it!

X