34 Results for the search "line":
Author: h.gras
Type: Model
Downloaded: 271 times
Date: 2017-08-15
Fault on a line
Description:
This model is a faulty line. The distance of the fault from the origin is a parameter. CP or PI models are used on each side of the fault according to the time step. If the time step is small enough t... see moreo simulate the propagation in the line with at least 10 time steps, CP is used, else it is PI.
Author: h.gras
Type: Example
Downloaded: 669 times
Date: 2015-06-16
Content of the webinar studies from A to Z on TRV
Description:
Designs built or presented during the webinar of the series Studies from A to Z on Transient Recovery Voltage
Models built:
- Rating TRV envelop (IEC 62271-100 / C37.010 - 2011)
- CP / ... see moreFD lines
- Thevenin equivalent of a network
Tag(s): TRV, Transient recovery voltage, short-line fault, terminal fault, substation, 62271, 37.011, lines, switching, thevenin
Author: h.gras
Type: Example
Downloaded: 782 times
Date: 2015-06-16
Content of the webinar studies from A to Z on lightning strokes
Description:
Designs built or presented during the webinar of the series Studies from A to Z on Lightning stroke analysis.
Models built:
- Metal Oxide surge arrester (IEEE working group 3.4.11)
- To... see morewer model for fast-front transients.
- Footing resistance of towers (with ionization effect)
- air-gap leader (Area Criterion Model and equal area integration (Cigre))
- FD lines
- Substation equipment
- Parametric studies
- Corona
Tag(s): Lightning, stroke, fast-front transient, tower, arrester, cigre, line, substation, parametric, corona, air-gap, leader
Author: n.sene
Type: Publication
Date: 2015-04-02
Short-Term Scheduling of Active Distribution Systems
Description:
The latest distribution management systems tend to incorporate optimization functions for the short-term scheduling of the various energy and control resources available in the network (e.g., embedded... see more generators, reactive power compensators and transformers equipped with on-load tap changers). The short-term scheduling procedure adopted in the paper is composed by two stages: a day-ahead scheduler for the optimization of distributed resources production during the following day, an intra-day scheduler that every 15 minutes adjusts the scheduling in order to take into account the operation requirements and constraints of the distribution network. The intra-day scheduler solves a non-linear multi-objective optimization problem by iteratively applying a mixed-integer linear programming (MILP) algorithm. The linearization of the optimization function and the constraints is achieved by the use of sensitivity coefficients obtained from the results of a three phase power flow calculation. The paper shows the application of the proposed approach to a medium-voltage 120 buses network with 10 dispatchable generators and 2 transformers equipped with on-load tap changers.
Authors: A. Borghetti, M. Bosetti, S. Grillo, M. Paolone, F. Silvestro
IEEE Bucharest Power Tech Conference, June 28th - July 2nd, Bucharest, Romania
Tag(s): Distributed generation, operation of distribution networks, MILP.
Author: n.sene
Type: Publication
Date: 2015-04-02
Indirect Lightning Performance of a Real Distribution Network with focus on Transformer Protection
Description:
The paper applies the Monte Carlo procedure proposed by the Authors to evaluate the indirect lightning performance of a real medium-voltage distribution network, which includes feeders and laterals, p... see moreoles, secondary substations and surge protection devices. Such a procedure allows inferring the amplitude of lightning-induced voltages at any point and any phase of the network. The analysis presented in this paper aims at assessing the expected mean time between failures of each MV/LV transformer caused by indirect lightning strikes.
A heuristic technique has been specifically developed to reduce the computational effort despite the non-linear response of the network enhanced by the presence of surge arresters.
Authors: Alberto Borghetti, Fabio Napolitano, Carlo Alberto Nucci, Fabio Tossani, Gilnei J. G. Dos Santos, Donorvan R. Fagundes, Gustavo P. Lopes, Manuel L. B. Martinez
2014 International Conference on Lightning Protection (ICLP), Shanghai, China
Tag(s): induced voltages; distribution networks; Monte Car lo method; lightning protection; MTBF.